• Home
  • About
    • Media Pack
    • Rates/Data
    • Contact
    • Circulation
  • Features
  • Newsletter
  • Previous Issues
  • Subscribe
  • News
  • Events & Exhibitions
  • Doors, Windows & Fittings
  • Heating & Ventilation
  • Restoration
  • Roofing & Cladding
  • Interiors & Interior Design
  • Floors & Flooring

RRNews

Banner
  • Home
  • About
    • Media Pack
    • Rates/Data
    • Contact
    • Circulation
  • Features
  • Newsletter
  • Previous Issues
  • Subscribe

Let the Experts Take Care of your Domestic Waste Water Problems

by admin October 2, 2014
written by admin October 2, 2014
Let the Experts Take Care of your Domestic Waste Water Problems

When it comes to off mains sewage many people can be blown away by all the information and differing products available on the internet, Google “domestic sewage treatment plant” and the consumer is bombarded by plants of all shapes and sizes which is why dealing with a specialist manufacturer, installer and servicer of treatment plants like We Build It Ltd can give the consumer piece of mind and confidence they are getting the right information, the right solution and the right system.

We Build It Ltd are based in the heart of some of Shropshire’s most outstanding countryside.  As one of the UK’s largest manufacturers of domestic sewage treatment plants, we focus on high quality, affordable products.  All of our sewage treatment plants are based on the successful and simple extended aeration method. We can design, manufacture, install and service sewage treatment plant for single houses, small developments, rural industrial units, campsites, pubs, hotels, offices, barn conversions and commercial applications. Our products can also be used after an existing septic tank to enable the effluent to be discharged directly to a water causeway, if your existing soak away has failed.

We often get asked;

How does it work?                                                            What does it cost?

Does it use electric?                                                         And how much?

Do I have to maintain it?                                                 How do I install it?

How big is it?                                                             Do I need to empty it?

What can go into the plant?                                           What happens to the waste?

Do I need planning permission?                                  Do I need to inform the Environment agency?

How long will it last?                                                    DOES IT SMELL!!!!!?????

All of these questions can be answered by We Build It experts who know their products inside out; ask a middle man with no knowledge of the industry, product or process these questions and the customer is often baffled by terms such as BOD, COD, NH4, but do they really need to know this? All the homeowner, builder or architect wants to know is that the product will work with the minimum effort from them during the life of the plant.

We Build It Ltd offer straight forward, easy to follow advice for your sewage treatment needs.  All of our sewage treatment plants come with easy to follow installation and service manuals, as well as free telephone assistance by specialist installers.  We can also offer full or assisted installations at very competitive rates.  We pride ourselves on offering the best GRP products on the market backed up by proper good old-fashioned customer service – (dial straight through and speak to our specialists, no automated service or queuing system) buying a sewage treatment plant can be quite daunting, which plant is best for my situation?? What are the regulations?? What about the Environment agency?? Etc. but be assured we will be with you every step of the way, making sure you have the right solution designed around your requirements. You deal direct with the manufacturer, with over 25 years waste water experience, 24-7-365 days of the year

For the self-builder the right treatment plant is simple to install providing they have taken the manufacturers advice, be aware some plants need complete concrete backfill which can add to install costs, a well-constructed plant such as the BioPure can be backfilled with pea gravel.

Consider whole life costs, not just the cost of the treatment plant, factor in install costs, power consumption, servicing, consumable spare parts, product life cycle (guarantee) and emptying charges, We Build It Ltd offer a 25 year guarantee on the treatment plant and 2 Years on the air pump.

biopure logo

Any plant up to 50 people (pe 50) should be manufactured and tested to EN12566-3, this gives the consumer confidence they are getting the right treatment plant for their application, but always ask to see the certificate and test results as these can be manipulated and not show the true outcome of the test.

Sizing the plant for a single house is simple its number of bedrooms plus two, so a three bedroom house is a 5 person treatment plant, for multiple dwellings using the same treatment plant speak to the manufacturer for the correct size unit, most manufactures range are in increments 1-5, 1-7, 5-13 etc. up to 50 person. (See Our Range Below)

table

The treatment plant you choose should be around 95% efficient thus allowing long intervals before de-sludge is required. The waste water must be cleaned to a standard meeting the usual discharge level requirement, you must apply for either an exemption certificate or permit, before making a discharge we can assist with this and advise on the method of discharge, be it a ditch, stream, watercourse or soakaway.

As the system breaks down and aerates the solids, the introduction of non-degradable items such as wipes, sanitary products etc. should be avoided at all times in any treatment plant, this will clog up the system and increase the need to empty the unit, follow this instruction and typical emptying will be around 3-5 years, it is also recommended no medicines, or harsh chemicals enter the unit, try to stick to Eco brands and stagger washing throughout the week.

main image

image

flowpath logo

We Build it has developed its range of package sewage treatment plants utilising proven SAF (submerged aerated filter) technology for maximum performance and reliability, using the most reliable energy efficient aeration blowers with a prolonged integral FlowPath system to maximise effluent quality.

All our Flowpath treatment plants are designed in accordance with the British Water Code of Practice for flows and loads, this range can be designed to meet your population and consent requirements, our standard range can accommodate up to 300 pe.

This range of products can be designed for larger scale commercial applications such as camping sites, leisure facilities, schools, hotels, offices and industrial applications.

image4

image3

Maintanance, Spares  And Servicing

The consumer needs easy to follow advice for their sewage treatment needs especially when servicing their plant, maintaining any sewage treatment plant, is a very important part of ensuring the efficiency of the system and that  you adhere to any operating and maintenance manual and annual servicing.

We strongly advise servicing the system on an annual basis and this will take on average less than an hour to complete. It will also help you to meet your legal requirements with the Environment Agency.

We Build It Ltd Service Contracts

  • Emergency breakdown cover for 12 months. If you have any problem with your unit, call us and we will come out and fix it free of charge.
  • One service visit where all necessary checks are carried out. This includes assessing the aeration pattern, sludge levels and effluent quality.
  • All labour expenses for servicing and call outs are covered so there are no hidden costs.
  • The cost of all serviceable parts will be free of charge. This includes rebuilding the air pump, replacing the diaphragms and also the air filters.
  • Sludge return is carried out as required. This is the removal of settled sludge from the outer scum ring back into the centre chamber to be re digested and treated again. This helps to keep the emptying period low.
  • Emptying is NOT included in the agreement as the Bio-Pure does not require emptying for 3-5 years.
  • The service agreement lasts for 12 months and will also help you meet your Environment Agency obligations regarding your Consent to Discharge. This includes keeping records of service, de-sludging and maintenance work for a minimum of 5 years.

image5

Our Other Products include

Mini SAF’s (for offices and outbuildings up to 4 persons)

Pump Stations (standard and bespoke)

Septic Tank Conversion Units (used as secondary treatment for underperforming septic tanks)

By Glyn Cann Business Development Manager “We Build It Ltd” Home of the BioPure and FlowPath treatment systems.

For a full range of our products and servicing visit

www.bio-pure.com

www.webuildit-ltd.co.uk

0 comment
admin

previous post
New ventilation brochure highlights energy saving and health benefits of fresh air
next post
Maximum performance from new Inceptor LED downlight

Related Articles

Applications Engineering Ltd – Pressure, Flow, Temperature and...

May 29, 2018

Kemper System delivers a lesson in flexibility with...

May 23, 2017

Rubik’s cube roof solved by Contour Roofing and...

May 23, 2017

Let the Experts Take Care of your Domestic...

April 18, 2017

Environmental Construction Solutions Limited: Specialists in Surface and...

March 13, 2017

BLACKPOOL PLEASURE BEACH IS THRILLED WITH KEMPER SYSTEM...

December 12, 2016

Triton’s TWS-Fastcoat delivers fast track elastomeric waterproofing

December 12, 2016

Kemperol Membranes Put Piccadilly Gate’s Roofs Back On...

October 26, 2016

Uni-dam Rainwater Management System – protecting businesses and...

September 5, 2016

Uni-dam Rainwater Management System – protecting businesses and...

July 27, 2016

Latest Issue

Media Partners

Follow me on Twitter

Tweets by @rrnews_social

Popular Posts

  • 1

    Environmental Construction Solutions Limited: Specialists in Surface and Waste Water Management

    March 13, 2017
  • 2

    Designing driveways, car parks or even HGV parks?… We’ll have a solution for you

    October 20, 2017
  • 3

    Restoring Stanford Hall for seriously wounded service personnel

    July 25, 2018
  • 4

    NEW AICO 160e SERIES: THE NEXT STEP IN ALARM EVOLUTION

    August 11, 2015
  • 5

    Internal refurb for listed cottage

    March 21, 2018

Recent Posts

  • Re-think, Re-purpose, Relax

    June 24, 2019
  • Queensgate Investments and Rockwell secure green light for Kensington Forum

    June 24, 2019
  • Intratone returns to CIH with key focus on tenant security

    June 20, 2019
  • East Devon District Council appoints Ian Williams to maintain its 4,200 properties during a new ten-year contract

    June 19, 2019
  • Selco launches branch refurbishment programme

    June 19, 2019

About Refurb Renovation News

Privacy Policy

Other Publications

Architect Projects
Construction UK Magazine
Luxury Hospitality Magazine
Luxury Interiors Magazine
Public Sector Building News
Restaurant Industry Magazine

Editor’s Picks

  • Re-think, Re-purpose, Relax

    June 24, 2019
  • Queensgate Investments and Rockwell secure green light for Kensington Forum

    June 24, 2019

Copyright 2020 | Refurb Renovation News | Privacy Policy

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

necessary Always Enabled

Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.

non-necessary

Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.