• Home
  • About
    • Media Pack
    • Rates/Data
    • Contact
    • Circulation
  • Features
  • Newsletter
  • Previous Issues
  • Subscribe
  • News
  • Events & Exhibitions
  • Doors, Windows & Fittings
  • Heating & Ventilation
  • Restoration
  • Roofing & Cladding
  • Interiors & Interior Design
  • Floors & Flooring

RRNews

Banner
  • Home
  • About
    • Media Pack
    • Rates/Data
    • Contact
    • Circulation
  • Features
  • Newsletter
  • Previous Issues
  • Subscribe

Victorian building transformed into modern teaching space

by Laura April 28, 2017
written by Laura April 28, 2017
Victorian building transformed into modern teaching space

A Victorian building and teaching space at Bishop Grosseteste University (BGU) has been transformed into a modern, flexible learning facility, thanks to a £350k refurbishment.

Work to improve the Centre for the Enhancement of Learning and Teaching (Celt Building) at the Lincoln-based site was designed by local architects, LK2, delivered by construction partner, Robert Woodhead Ltd and procured through the empa ii Minor Works Framework.

The original building featured a collection of mid-Victorian neo-gothic vaulted spaces, recently used as art class rooms. It required a sensitive design, due to its historical significance and structural issues.

Steve Deville, BGU Director of Resources, said: “The development has truly transformed this space to create an open modern facility, which remembers and works well with the original Victorian building.

“Of course the most important aspect is the addition of another high class development which engages students and staff in the enhancement of learning and teaching. The project encountered serious challenges associated with working in an old building, but the quality of the finish which has resulted in extremely positive comments from those already engaging with the centre have made it all worthwhile.”

Featuring large openings between the vaulted rooms and tall ceilings highlighted with up-lighting to soften the white walls and ceilings, the design has used copper to reference the original red-brick Victorian building.

The new entrance from an existing courtyard is surrounded by illuminated copper work. The building has a large entrance lobby with reception, seating and two meeting rooms. Through a large opening is the ‘Student Support Space’, which includes IT resources and seating areas for personal conversations, as well as sofa pods for more private discussions.

A vaulted area, featuring two 70 metre Danish oil treated glulam timber beams, houses a giant studio desk, which has been designed to encourage all departments of the CELT centre to not only work there, but share and discuss ideas. Two further offices, one featuring two newly uncovered and refurbished original brick gothic arches, and a disabled accessible toilet facility flank the other side of the ‘Student Support Space’.

Juliet Slater, Team Leader for Woodhead’s Lincoln-based team, said: “We’re delighted with the completed CELT Building. The work we have done has enabled the building to still retain its original Victorian features, while having a fresh modern interior.

“This project forms part of a programme of work we have been delivering for BGU over the past two years, creating a range of teaching, learning and meeting spaces. From the refurbishment of historical buildings, to the creation of new structures, the work we have already completed, and the project which is still in progress, have collectively changed the face of the university’s facilities.”

The designs were drawn up by Lincoln-based architects, LK2. Andrew Kitchen, Director at LK2, said: “It’s been great to work with Bishop Grosseteste University and Robert Woodhead Ltd to deliver the refurbishment of the CELT building as part of the wider project here at the university.

“This has been an outstanding project, the original interior of the Victorian building wasn’t suitable for the proposed use and needed to be transformed to create flexible, contemporary spaces. We were challenged by the building’s structural issues, but worked hard to keep its historical features, which has helped us to achieve a design we are proud of.”

The project was procured through the empa framework which was formed by local authorities in the East Midlands and is managed by Scape Group. It aims to improve the procurement and delivery of construction projects and property maintenance for public sector bodies – saving time and money for them and in turn for council taxpayers.

Ian Towlson, regional frameworks manager for empa, said: “Working together, Woodhead and LK2 have transformed this building into an innovative and modern working space that meets the needs of its users.

“At empa we put community impact at the heart of all our projects, and we hope that students will continue to be inspired to work hard and achieve thanks to the facilities Woodhead and LK2 have provided.”

0 comment
Laura

previous post
Contemporary restoration transforms highland farmhouse
next post
Choose a Stovax wood burning stove

Related Articles

Queensgate Investments and Rockwell secure green light for...

June 24, 2019

Essex eco-friendly leisure centre officially opened by royalty

June 18, 2019

Insolvency Practitioner SFP secures future of central Birmingham...

June 11, 2019

Kirkwall airport refurbishment work completed six months ahead...

June 6, 2019

Extentia group completes hospitality refurb at Emerald Headingley

May 23, 2019

Canmoor complete phase one of extensive Anchorage refurbishment

April 17, 2019

Garador helps safeguard children

April 12, 2019

ISG appoints REL for multi-million-pound M&E contract

March 29, 2019

Curtain rises on ‘stunning’ Congress theatre

March 29, 2019

Millcroft Hits the Right Note for Iconic Record...

March 12, 2019

Latest Issue

Media Partners

Follow me on Twitter

Tweets by @rrnews_social

Popular Posts

  • 1

    Environmental Construction Solutions Limited: Specialists in Surface and Waste Water Management

    March 13, 2017
  • 2

    Designing driveways, car parks or even HGV parks?… We’ll have a solution for you

    October 20, 2017
  • 3

    Restoring Stanford Hall for seriously wounded service personnel

    July 25, 2018
  • 4

    NEW AICO 160e SERIES: THE NEXT STEP IN ALARM EVOLUTION

    August 11, 2015
  • 5

    Internal refurb for listed cottage

    March 21, 2018

Recent Posts

  • Re-think, Re-purpose, Relax

    June 24, 2019
  • Queensgate Investments and Rockwell secure green light for Kensington Forum

    June 24, 2019
  • Intratone returns to CIH with key focus on tenant security

    June 20, 2019
  • East Devon District Council appoints Ian Williams to maintain its 4,200 properties during a new ten-year contract

    June 19, 2019
  • Selco launches branch refurbishment programme

    June 19, 2019

About Refurb Renovation News

Privacy Policy

Other Publications

Architect Projects
Construction UK Magazine
Luxury Hospitality Magazine
Luxury Interiors Magazine
Public Sector Building News
Restaurant Industry Magazine

Editor’s Picks

  • Re-think, Re-purpose, Relax

    June 24, 2019
  • Queensgate Investments and Rockwell secure green light for Kensington Forum

    June 24, 2019

Copyright 2020 | Refurb Renovation News | Privacy Policy

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

necessary Always Enabled

Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.

non-necessary

Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.